53″ Blackwell Bow

The fore deck was rotten from the stem aft (about four feet).

Before:

 

Workflow:

  • Removed the forward rotten portion of the deck
  • Repaired three feet of the stem
  • Made new sheer clamps
  • Made new deck beams
  • Installed longitudinal stem knee
  • Butt-blocked and re-planked the deck
  • Fiberglassed the restored fore deck

 

DobBow-1786DobBow-1852-sm