Skip to content

Backcountry Boatworks

Beautiful Woodwork, Craftsmanship & Quality

  • Home
  • Services
  • Projects
  • Contact

53″ Blackwell Bridgedeck

Customer had installed a freezer on the original bridge deck. The new freezer blocked the flow of water from the deck, damaging the forward part of the deck. We removed the rotten freezer box and the deteriorated deck and rebuilt the bridge area.

Before:

DobBridge-1821
DobBridge-1823

 

Workflow:

DobBridge-1881
DobBridge-1932
DobBridge-1945
DobBridge-2273

 

DobBridge-1933
DobBridge-1955
DobBridge-2278

Added a teak deck with engine room companionway. Reframed all.

DobBridge-2461

 

 

Share this:

  • Click to share on X (Opens in new window) X
  • Click to share on Facebook (Opens in new window) Facebook
Like Loading...
Website Powered by WordPress.com.
  • Subscribe Subscribed
    • Backcountry Boatworks
    • Already have a WordPress.com account? Log in now.
    • Backcountry Boatworks
    • Subscribe Subscribed
    • Sign up
    • Log in
    • Copy shortlink
    • Report this content
    • View post in Reader
    • Manage subscriptions
    • Collapse this bar
 

Loading Comments...
 

    %d