Customer had installed a freezer on the original bridge deck. The new freezer blocked the flow of water from the deck, damaging the forward part of the deck. We removed the rotten freezer box and the deteriorated deck and rebuilt the bridge area.
Before:
Workflow:
Added a teak deck with engine room companionway. Reframed all.